Abu Dhabi | Dubai | Al Ain | All Emirates
24/7 emergency callout 📞 +971 55 464 7375
Home / Projects
Recent work
Method, depth and duration for each job, so you can judge whether we have done work like yours before.
Fourteen openings through a 350 mm RC core wall, cut over three night shifts with the building live.
Method: Wall sawingDepth: 350 mm
240 cores from Ø100 to Ø350 mm across nine floors, scanned and set out ahead of each pour.
Method: Slab coringCores: 240
Wire sawing and lift-out of a 90 m² section, propped, craned and cleared in six days.
Method: Slab demolitionArea: 90 m²
180 linear metres of trench cut through a 250 mm ground slab for drainage and power routes.
Method: Floor sawingLength: 180 m
Duct penetration formed through a 900 mm downstand beam under engineer approved propping.
Method: Beam cuttingSection: 900 mm
Concrete flight and landings cut free and removed through a standard doorway in sections.
Method: Stair demolitionElements: 3 flights
[Images apni site photography se replace kar lena — source note]
Sectors
Riser penetrations and core wall openings on live floor plates.
Night shift cutting with full containment in occupied buildings.
Machine bases, plinths and trenches in Mussafah, ICAD and Al Quoz.
Villa openings and staircase removal across Al Ain and Khalifa City.
Send the drawings and we will tell you the method, the duration and the price.